Note: The online Request to Speak window has expired.
Agenda Item
L.-3 25-1872 Approval by the Board of Education of Change Order No. 1, Agreement Between Owner and Contractor, by and between the District and RK Roofing & Construction, Inc., San Leandro, CA, for the latter to replace the dry-rotted roof deck lumber, demolish the insulation within HVAC equipment, tapered insulation in valleys and walkways; install new ISO insulation in the valleys, HVAC wells, and walk paths; hire a structural engineer, treat dry-rotted structural beams, and install six structural plates to support the beams, as outlined in PCOs No. 1 to No. 3 for the Highland Child Development Center Roof Replacement Project, in the not-to-exceed amount of $320,337.28, increasing the Agreement price from $297,000.00 to $617,337.28. All other terms and conditions of the Agreement remain in full force and effect.