V.-15 22-1239 Approval by the Board of Education of Agreement Between Owner and Contractor by and between the District and Golden Bay Fence Plus Iron Works, Inc., Oakland, CA, for the latter to furnish and install 65' of new 8' tall 1" mesh galvanized fence, including 1 each 20" opening rolling gate with concrete grade beam and commercial 1 HP gate operator system. Includes access keypad on gooseneck pedestal with 2 each yellow bumper posts from either approach side, and includes safety loop and exit loop; fence to have 1 O' to 24" outrigger mesh to prevent roof accessibility for the 900 High Street Rolling Gate Repair Project, in the amount of $84,849.00, which includes a general contingency allowance of $8,500.00, as the lowest responsible, responsive bidder, with the work anticipated to commence on June 9, 2022, and scheduled to last for ninety (90) days, with an anticipated ending of September 6, 2022.