16-0384 Approval by the Board of Education of Agreement for Architectural Services between District and Byrens Kim Design Works, Oakland, CA, for the latter to provide implementation design of Prop 39 projects - install occupancy sensors at 24 classrooms DE lamp existing light fixtures at Building A Upstairs Hallway and Building B Ground floor hallways; Replace various MH/HPS/Mercury Vapor exterior lights with bi-level LED lights. (±70 fixtures); and Install new DOC control system to replace existing pneumatic thermostat and control system, expand existing Enlighted control system; - in conjunction with the Bret Harte Middle School Lighting Upgrades - Prop 39 Project, more specifically delineated in the Scope of Services in Exhibit "A", incorporated herein by reference as though fully set forth, for the period commencing March 11, 2016 and concluding December 31, 2016 in an amount not to exceed $24,700.00.