55 15-0862 Approval by the Board of Education of Resolution No. 1415-1120 - Award of Bid and Construction Contract between District and Summerhill Electric, Oakland, CA, for the latter as the lowest responsive, responsible bidder and rejecting all other bids, if any, to install new Fire Alarm head panel, built and supplied by Simplex (labor to install only, no materials), new conduit and wire for added devices to existing system; paint all new conduits to match existing surfaces, no demo of existing devices or conduit; provide trained installer with asbestos training for installation of boxes and conduits to plaster and drywall surfaces, deemed hot in conjunction with the Foster Central Commissary (PEC Move) Project, for the period commencing May 27, 2015 and concluding no later than October 1, 2015, in the amount of $60,000.00.